Coffee Queen DA 4 Manuel d'utilisateur Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
19.
4. Inst allation and st art.
5. Rinsing and filling up water system.
4.3.
T urn on control switches for upper hotplate
and lower hotplate.
Ensure that the lamps turn on and that the hot
plates get warm.
Then turn off control switches.
5.2.
Place the pot on the hot plate under the filter holder .
T urn on control switch for brewing.
Press the button (Full brew12 cups) and the
water shall start pouring.
When brewing is ready , empty the pot.
Brewing will take about 6 minutes.
Lower hotplate
Upper hotplate
5.1.
Do the first brewings with water only.
Place filter holder without filter and coffee.
Note!
Do not make any adjustments of water volume in pot, after the first brewing
with water only!
When first brewing, the machine will filling up water system. For this, machine will use
approx. 4 dl of water.
GB
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 27 28

Commentaires sur ces manuels

Pas de commentaire